|
PROPERTY MAINTENANCE PHOTOGRAPHS Weather tightness issues
 Concrete stair wall junction |
 Crack in monolithic sheet |
 Non slip deck membrane |
 Timber decay |
Roofing
 Lockwood roof stripped prior to insulating |
 Roof raised, insulation added |
 New chimney pots |
 New lead roof |
 Traffigard installation |
Pre Paint Maintenance
 Garage door corrosion |
 Rusty spouting to be replaced |
Ceramic tile work
 Ceramic tile work |
Fencing
 Security fence with windbreak |
General engineering
 Canopy and industrial concrete crossing |
 Canopy under construction |
 Rust to be cut out |
Demolition
 Pre demolition |
 After demolition |
Commercial painting
 Commercial repaint |
 Painting and maintenance access |
 Pre paint |
 Post paint |
 Up to 40,000psi surface blasting |
 Repaint project |
Residential painting
 Painting and maintenance access |
 Residential repaint |
 Tight access !! |
Decorative Walls
 Stone Wall |
Concrete Work
 Pre upgrade |
 During upgrade |
-
 Industrial truck crossing |
Carpentry
 New deck and screen |
 Non complying balustrade |
 Complying balustrade |
 8metre high wall construction in progress |
 Wall completed |
 Garage pre conversion |
 Conversion in progress |
 Conversion complete |
 Metal framed construction |
 Timber framed construction |
 Original deck |
 Transformed deck |
 Pre paint timber decay |
 Windblown rubbish taken from roof |
CONTACT US back to top
Home |
Consultancy
| Commercial
| Residential
| Property
Management | Photos
| Contact
Us
|